掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


First Nickel production in 2013 and respect for 2014

  • Monday, January 20, 2014
  • Source:

  • Keywords:First Nickel production nickel ore
[Fellow]
First Nickel Inc. ("FNI" or the "Company") provides its 2013 preliminary production results and outlook with respect to 2014 production and costs on Jan.16th.
 
2013 Highlights
-- Achieved full production at the Lockerby Mine in Ontario's Sudbury Basin.
-- Shipped approximately 242,000 tonnes of ore to Glencore.
-- Produced approximately 12.8 million contained pounds of nickel, at the            mid-point of the 2013 guidance range of 12.1 - 13.5 million pounds.
-- Produced approximately 7.5 million contained pounds of copper, at the             mid-point of the 2013 guidance range of 7.2 - 7.9 million pounds.
-- The Company expects mine site operating costs(1) to be at the lower end            of the $55.3 - $60.8 million guidance range.
-- Underground development reached the 68-level at Lockerby in December            2013.
-- Unrestricted cash balance of $3.5 million as at December 31, 2013, and total liquidity of $8.5 million, including availability under the revolving credit facility.
    2013 full-year financial and operating results will be released in March 2014.
 
Mr. Thomas M. Boehlert, President and CEO of FNI, commented, "2013 was an important year for FNI in which the Lockerby mine achieved full production and met its nickel and copper production targets. FNI responded to liquidity pressures from lower nickel prices by reducing the number of levels to be developed at Lockerby at this time, renegotiating the ore purchase and sale agreement with Glencore, restructuring and increasing debt facilities and closely managing expenditures."
 
Summary 2014 Outlook
-- Production of between 13.5 and 15.1 million pounds of contained nickel,            a 12% increase (mid-point) over 2013;
-- Production of between 7.2 and 8.0 million pounds of contained copper;
-- GMV(1)-net production of between 6.8 and 7.6 million pounds of nickel,            and between 3.6 and 4.0 million pounds of copper;
-- Mine site operating costs(1) between $58.1 and $61.0 million;
-- Cash production costs(2) between $5.22 and $5.74 per pound of GMV(1)-net
            payable nickel.
                                                                                2014
        ----------------------------------------------------------------------------
        Contained nickel lbs (millions)                                  13.5 - 15.1
        Contained copper lbs (millions)                                    7.2 - 8.0
        GMV(1)-net payable nickel lbs (millions)                           6.8 - 7.6
        GMV(1)-net payable copper lbs (millions)                           3.6 - 4.0
        Mine site operating costs(1) (millions)                        $58.1 - $61.0
        Cash production costs per net-GMV(1) Ni lb(2)                  $5.22 - $5.74
 
Assumptions: Cu per lb $3.25, CAD/USD 1:1
       
FNI has adapted its production and cost metrics to reflect the amended gross-metal-value (GMV(1)) ore-sales agreement signed with Glencore in the second half of 2013.
 
Capital expenditures
 
Capital expenditures in 2014 are projected to be approximately $7.2 million, including approximately $3.5 million relating to underground development.
 
General and Administrative ("G&A")
 
G&A expenses for 2014 are projected to be approximately $4.4 million, not including stock-based compensation. Financing costs and exploration expenditures are projected to be approximately $1.8 million and $0.4 million, respectively, in 2014.
  • [Editor:editor]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 三原县| 乌兰浩特市| 霍邱县| 苍南县| 尖扎县| 济阳县| 龙山县| 白河县| 颍上县| 江都市| 厦门市| 泗阳县| 广平县| 疏附县| 张掖市| 昌宁县| 习水县| 柳州市| 弋阳县| 乌兰浩特市| 安达市| 宁河县| 灵台县| 阜阳市| 墨玉县| 柳江县| 曲沃县| 林芝县| 张北县| 红河县| 乐安县| 武安市| 阳江市| 吴江市| 左贡县| 高台县| 霍林郭勒市| 泊头市| 炉霍县| 木兰县| 晋宁县|