掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Vietnam approves plan to cut power output from coal-fired plants

  • Friday, May 19, 2023
  • Source:ferro-alloys.com

  • Keywords:Vietnam, power output, coal-fired plants
[Fellow]The plan showed Vietnam would double its power generation capacity to more than 150 gigawatts by 2030 from 69 gigawatts at the end of 2020.

 
The Vietnamese government has approved a plan that needs 134.7 billion U.S. dollars to reduce coal-fired electricity generation and improve the country's power grid by 2030, the Vietnam News reported on Tuesday.
 
The plan is aimed at ensuring Vietnam's energy security as the country is set to maintain an annual gross domestic product (GDP) growth rate of 7 percent until 2030 while shifting toward carbon neutrality by 2050.
 
Under the plan, coal-fired power output would drop to 20 percent of power supply by 2030 from almost half now while the share of renewable energy in the country's power mix would be raised to between 67.5 and 71.5 percent.
 
The plan showed Vietnam would double its power generation capacity to more than 150 gigawatts by 2030 from 69 gigawatts at the end of 2020.
 
Coal-fired power would account for 30.13 gigawatts or 20 percent of the mix by 2030, followed by hydropower with 19.5 percent, wind energy with 18.5 percent and solar power with 8.5 percent, according to the draft.
 
Under the plan, half of office buildings and homes in Vietnam would be powered by rooftop solar panels by 2030, and the country would also aim to export green energy with a target of 5-10 gigawatts by 2030.
 
Xinhua

 

  • [Editor:kangmingfei]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 潼南县| 衡东县| 龙井市| 孝感市| 宜兰县| 轮台县| 红安县| 崇左市| 镶黄旗| 望都县| 津南区| 三门县| 石阡县| 唐山市| 陈巴尔虎旗| 晋州市| 长子县| 沽源县| 类乌齐县| 微山县| 洪湖市| 望城县| 正宁县| 皋兰县| 平昌县| 海口市| 汝州市| 辽源市| 乌苏市| 集安市| 犍为县| 灵石县| 双桥区| 泉州市| 张北县| 通江县| 阜城县| 思南县| 阜新市| 浦县| 尚义县|