掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Successful lifting of the first column of No.2 boiler in 2 × 350MW + 1 × 380mW project of Indonesia Qingshan phase V

  • Thursday, March 4, 2021
  • Source:ferro-alloys.com

  • Keywords:Qingshan,Indonesia
[Fellow]Successful lifting of the first column of No.2 boiler in 2 × 350MW + 1 × 380mW project of Indonesia Qingshan phase V

[ferro-alloys.com]

  On the morning of March 2, Northwest Thermal Power (Group) Co., Ltd. contracted to build Indonesia Qingshan phase V 2 × 350MW + 1 × 380mW coal-fired power plant complex turnkey project. The first column of 2# boiler steel structure was successfully lifted and put in place. It marks the formal start of the installation work of the unit, and lays a solid foundation for the subsequent smooth construction of the unit.

 

  • [Editor:Catherine Ren]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 六安市| 屯留县| 丹寨县| 洪洞县| 平果县| 香河县| 九寨沟县| 高邑县| 台山市| 乌拉特后旗| 阳江市| 类乌齐县| 奇台县| 奉贤区| 周口市| 苍溪县| 德格县| 资中县| 河间市| 舒兰市| 天台县| 石楼县| 白沙| 南投市| 视频| 深州市| 墨竹工卡县| 大兴区| 尼勒克县| 惠来县| 丹棱县| 望城县| 全南县| 松溪县| 屏东市| 平安县| 崇州市| 宜昌市| 江源县| 德江县| 晋州市|