掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Ivanhoe expedites construction at Platreef mine

  • Monday, July 27, 2020
  • Source:ferro-alloys.com

  • Keywords:Ivanhoe,Platreef mine
[Fellow]Ivanhoe expedites construction at Platreef mine

[ferro-alloys.com]Ivanhoe Mines (TSX: IVN) has announced that its South African subsidiary, Ivanplats, has completed the construction of the 996-metre-level station at the bottom of the Shaft 1 at the Platreef mine.

In a press release, Ivanhoe’s co-chairmen Robert Friedland and Yufeng “Miles” Sun said that the work was finished well ahead of the contractual schedule. 

According to Friedland and Sun, the Shaft 1 now is positioned to be equipped as Platreef’s initial production shaft. This, if Ivanhoe chooses to proceed with phased development to expedite production at the tier-one palladium-platinum-nickel-copper-rhodium-gold project located on the Northern Limb of South Africa’s Bushveld Complex.

“Given the flurry of recent transactions in precious metals markets, we are actively exploring a number of options that can help us unlock Platreef’s extraordinary value for the benefit of all Ivanhoe stakeholders,” Friedland said. “After all, Platreef is among this planet’s largest precious metals deposits.”

The operation now has a completed shaft within a few hundred metres of the initial high-grade mining zone. Friedland also said that it has a mining license, water, and a team of highly-skilled employees. 

“The deposit has enormous quantities of palladium, platinum, rhodium, nickel and copper; and it has more ounces of gold than many leading gold mines,” Friedland said. “Given the current precious metals environment, I am confident that the pending studies will showcase the exceptional economics that one would expect from such a thick, high-grade and flat-lying deposit.” 

Platreef’s current indicated mineral resources are 346 million tonnes grading 3.77 grams per tonne (g/t) 3PE+gold (1.68 g/t platinum, 1.70 g/t palladium, 0.11 g/t rhodium, 0.28 g/t gold), 0.32% nickel and 0.16% copper at a 2.0 g/t 3PE+gold cut-off.

These resources contain an estimated 26.8 million ounces of palladium, 25.6 million ounces of platinum, 4.5 million ounces of gold, and 1.8 million ounces of rhodium, plus 4.1 billion pounds of nickel and 2.1 billion pounds of copper, at a cut-off grade of 1 gram per tonne.

(Mining.com)

  • [Editor:王可]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 枣强县| 花莲县| 台东县| 建德市| 五指山市| 宣汉县| 平定县| 朝阳县| 光山县| 秭归县| 武冈市| 淮滨县| 宜昌市| 海伦市| 崇仁县| 敖汉旗| 汉沽区| 边坝县| 梁河县| 枣阳市| 北票市| 镇安县| 甘泉县| 博罗县| 清丰县| 乐清市| 温宿县| 渝中区| 广宁县| 晋城| 兴仁县| 阳山县| 镇赉县| 邯郸县| 织金县| 来安县| 卢龙县| 西华县| 道真| 南川市| 兰坪|