掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Galaxy moves Sal de Vida lithium project to design phase

  • Wednesday, July 8, 2020
  • Source:ferro-alloys.com

  • Keywords:Galaxy,Sal de Vida lithium project
[Fellow]Galaxy moves Sal de Vida lithium project to design phase

[ferro-alloys.com]Australia’s Galaxy Resources (ASX:GXY) confirmed on Tuesday that it is on track to begin production at its Sal de Vida lithium brine project in Argentina by 2022, despite the covid-19 pandemic impacting the development schedule.

The Perth-based lithium producer and developer put the brakes on its flagship project in April, following a nation-wide lockdown ordered by the Argentinean government to contain the spread of the coronavirus.

Work resumed in May under strict provincial protocols, which Galaxy said has hindered ground transportation and the movement of employees during the current design phase.

Impact on the overall schedule had been minimized through the adoption of an early works phase, Galaxy said. The company noted that while it is still targeting first production in 2022, it expects it now to be in the fourth quarter of the year.

Early works, such as pond construction and the procurement of long-lead items, are slated to begin in early 2021.

Galaxy Resources has de-risked the Sal de Vida Project by developing a simplified flowsheet, using mature technology and staging development.

Low-cost brine mine

The company aims to have a highly-competitive, low-cost lithium brine mine on the Salar del Hombre Muerto salt pan in north-west Argentina.

The project lies over 4,000 metres above sea level, part of the “lithium triangle” that includes neighbouring Chile and Bolivia, and which is home to more than 60% of the world’s annual lithium production.

Galaxy estimates Sal de Vida would take $474 million to develop and generate $354 million in annual revenue.

The company estimates it will spend about $12 million in the second half of 2020 on piloting, engineering, well drilling and owner costs.

Over a mine life of 40 years, Sal de Vida is expected to yield up to 25,000 tonnes a year of lithium carbonate for batteries and 95,000 tonnes of potassium chloride, a key fertilizer ingredient.

(Mining.com)

  • [Editor:王可]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 文水县| 色达县| 禹州市| 泽普县| 栾川县| 湛江市| 澄迈县| 两当县| 阳高县| 新巴尔虎左旗| 绥阳县| 元谋县| 秦安县| 商洛市| 黎平县| 阿坝县| 老河口市| 施甸县| 定安县| 漳浦县| 龙井市| 无锡市| 四平市| 门源| 敦煌市| 兴文县| 阳信县| 玉环县| 星座| 兴义市| 高密市| 延庆县| 普兰县| 苏州市| 扶风县| 赣州市| 阿巴嘎旗| 康乐县| 滨海县| 昭平县| 汤原县|