掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


"Pangang aircraft carrier fleet"

  • Monday, March 16, 2020
  • Source:ferro-alloys.com

  • Keywords:"Pangang aircraft carrier fleet"
[Fellow]"Pangang aircraft carrier fleet"
The reporter recently learned that the east area will continue to gather "east area strength" for building "Pangang aircraft carrier fleet" through close communication, improved service, strengthened guidance and other ways.
It is understood that building "Pangang aircraft carrier fleet" is a major decision made by our city after careful consideration and joint research based on the actual development of Pangang and the whole city and in-depth implementation of the relevant decisions and arrangements of the central, provincial and municipal Party committees. We will focus on building Pangang into a world-class vanadium and titanium enterprise of 100 billion level, build an excellent "Pangang aircraft carrier fleet" and collectively "sail out" to speed up the building of the world Grade V-Ti industrial base, to build a solid foundation for Panzhihua to fully integrate into the national strategy of Chengdu Chongqing Shuangcheng economic circle.
At present, Panzhihua Iron and Steel Group has 16 projects settled in the east area. The east area will thoroughly arrange the key projects accelerated by Panzhihua Iron and Steel Group, actively connect the project plan, construction progress and other contents, and strive to integrate the specific work into the "14th five year" development plan of the east area. Further strengthen project management, include 16 projects into the first batch of key projects in 2020, determine a package leader, a coordination and promotion team, and work with Pangang to accelerate the project.
East District will actively connect with Panzhihua Iron and Steel Group, guide the warehousing work of investment projects, ensure the timely warehousing of investment projects in Panzhihua Iron and Steel Group, and realize the unified investment of Panzhihua Iron and steel group. At present, six projects about to be completed, including the follow-up project of design change of mining company's Jianshan open pit to underground mining project and the phase I project of mining company's Majiatian tailing reservoir replacement reservoir, have been successfully included in the investment statistics database in the East District, with a total investment of 813 million yuan.
In addition, the East District will further strengthen the communication and coordination with the provincial and municipal development and Reform Commission, and guide Panzhihua group packaging Mining Co., Ltd. to apply for the provincial budget funds for energy conservation, environmental protection and ecological construction in 2020 for three projects, i.e. phase I project of Majiatian tailings reservoir replacement reservoir, phase I project of waste refractory resources comprehensive utilization of metallurgical materials company and phase I project of Panzhihua Iron ore waste comprehensive utilization. To guide Panzhihua Iron and Steel Group to apply for Sichuan Engineering Research Center and Engineering Laboratory in 2020, seize the opportunity of revitalization and development of old industrial zone and transformation and development of Resource-based area, organize Panzhihua Iron and Steel Group to apply for alternative independent industrial and mining area, complete the transformation and relocation evaluation of old industrial Zone, and strive for policy support of national independent industrial and mining area and national revitalization of old industrial base for building "aircraft carrier fleet of Panzhihua Iron and Steel Group" 。
From: Tuduo
  • [Editor:sunyanan]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 麦盖提县| 清河县| 贺州市| 洱源县| 临澧县| 凤凰县| 峨边| 惠安县| 海兴县| 珠海市| 彭泽县| 益阳市| 长沙市| 衡东县| 民县| 巨野县| 木兰县| 乌拉特中旗| 察哈| 南郑县| 盐亭县| 湖北省| 顺义区| 竹北市| 大英县| 黑河市| 宽甸| 阳新县| 盐山县| 红原县| 东乡县| 东乡族自治县| 遂溪县| 苏尼特左旗| 临沧市| 连城县| 陈巴尔虎旗| 陆良县| 马鞍山市| 彩票| 双牌县|