掀开奶罩边躁狠狠躁苏玥视频,无码专区3d动漫精品,去阳台跪着把屁股抬起来,精品国产丝袜黑色高跟鞋


Mechel Has Big Plans for Bratsk

  • Monday, November 1, 2010
  • Source:

  • Keywords:ferrosilicon, FeSi
[Fellow]

 Mechel has signed contracts to purchase four electric furnaces for Bratsk, each with a capacity of 33 MVA to replace the existing furnaces. The refurbishment will take place during 2011-2012 and after the project is completed Bratsk’s capacity will increase by 30% and its power consumption will be reduced by 10-13%.

Bratsk’s current capacity is 91,000 mtpy of ferrosilicon. The project will be financed via credit facility provided by Sberbank.
  • [Editor:editor]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!
主站蜘蛛池模板: 城步| 翼城县| 紫金县| 石家庄市| 乌兰察布市| 密山市| 库车县| 密云县| 启东市| 普安县| 云霄县| 扶绥县| 壤塘县| 江津市| 广东省| 阳新县| 常宁市| 绩溪县| 昌图县| 客服| SHOW| 日喀则市| 尼勒克县| 攀枝花市| 庆城县| 洪雅县| 兴国县| 康平县| 永登县| 重庆市| 贺州市| 登封市| 门源| 保山市| 仙桃市| 永济市| 策勒县| 高淳县| 涟源市| 辽中县| 册亨县|